Rock Drill in Germany - TERRA-JET DJ 20

TERRA-JET DJ 20 lays power lines as well as around fiber optic lines.
Job site description

A large German net contractor lays every day trenchless cables in the region Eifel with his HDD machine TERRA-JET DJ 20 (old name: TJ 2808 S). These cables are powerlines or fiber optic cables.

The Eifel is well known for hard and rocky ground. Bores up to 120 m (400 ft) lengths and ø 200 mm (8“) they drills with their own machine. Larger bores they give to partner companies with larger HDD machines.

We had the chance to visit one of his interesting bores close to the border to Luxembourg. It was drilled in slate rock. The bore was parallel to the country road 65 m (215 ft) long. A HDPE pipe OD 140x12.7 mm (OD 5.7“x 0.5“) had to be pulled in. This cable pipe is a protection for a high speed fiber optic cable.


Job realization

The pilot bore was drilled with the 3-fingerhead right on target. In slate rock the Carve Mode of the DJ 20 is a big help. It allows controlled steering even in rocky ground.

The high rod rotation of 230 rpm allows fast and productive drilling. The high torque of 2'800 Nm (2'000 ft.lbs) at a pullback force of 9 tonnes (20'000 lbs) guarantee successful reaming of the bore channel in such hard ground conditions.

Reaming was done with the new TERRA reamers ROCK. The Cruise Mode of the TERRA-JET DJ 20 is adjusted at high rotation speed and low pullback speed. Then the TCI tips cut the slate rock. The cuttings are flashed out of the bore channel with the drilling fluid. The drilling fluid volume is max. 100 ltr/min (25 gpm).


Pic 1: TERRA-JET DJ 20 lays power lines as well as around fiber optic lines.

Pic 2: The pilot hole is drilled accurately with the 3-finger head.

Pic 3: Slate rock in the Eifel.

Pic 4: The road crossing to the main connector has been laid. The 65 m (215 ft) long bore parallel to the road is intermedium reamed.

Pic 5: The cabletrailer with the HDPE pipe OD 140x12.7 mm (OD 5.7“x 0.5“) is prepared.

Pic 6: The HDPE pipe OD 140 mm (5.7 in) is pulled in.

Pic 7: The pipe pulling is finished.


The pilot hole is drilled accurately with the 3-finger head.
Slate rock in the Eifel.
The road crossing to the main connector has been laid. The 65 m (215 ft) long bore parallel to the road is intermedium reamed.

The cabletrailer with the HDPE pipe OD 140x12.7 mm (OD 5.7“x 0.5“) is prepared.
The HDPE pipe OD 140 mm (5.7 in) is pulled in.
 The pipe pulling is finished.